5107 Cambutal Creek – Erosion Control

In Cambutal, Los Santos Province, we are contracted to do a feasibility study for an erosion protection and control project. GLC has partnered up with Maccaferri who are world known for their engineered solutions for coastal and river control. The feasibility study phase has been completed and in Q-1 2020 we entered the next phase which is the project execution of the erosion protection works. The erosion protection works are in a coastal area where the Cambutal river meets the Pacific Ocean.

Year : 2019 - 2020

Project Name : 5107 Cambutal Creek – Erosion Control

Location : Cambutal, Panama